|
Type
[1] |
Number
[2] |
Title
[3] |
Name
of Convener [4] |
Created[5] |
Disbanded
[6] |
|
WG |
B5.01 |
Autoreclosing
and system restoration |
James
(UK) |
2000 |
2003 |
|
WG |
B5.02 |
Co-ordination
of digital relays and CTs |
Holst
(SE) |
1998 |
2002 |
|
WG |
B5.03 |
Fault
and disturbance analysis including intelligence |
Rodriguez
(ES) |
1999 |
2003 |
|
WG |
B5.04 |
Novel
electronic and optical sensors, Impact on
SC&P |
Brockett
(CH) |
1997 |
2002 |
|
WG |
B5.06 |
S/S
P&C lifetime assessment and refurbishment |
K.
Foers |
2002 |
2005 |
|
WG |
B5.07 |
The
automaiton of new and existing substations, why and
how? |
Baass
(CH) |
1999 |
2003 |
|
WG |
B5.08 |
Isolation
and restoration policies against power system
collapse |
Matsuura
(JP) |
1999 |
2002 |
|
WG |
B5.09 |
Optimised
protection during system disturbances |
Mackey
(IE) |
1998 |
2002 |
|
WG |
B5.12 |
Independent
power production, protection and substation control
issues |
Plumptre
(CA) |
1999 |
2002 |
|
WG |
B5.14 |
Numerical
relay setting procedures and tools |
Humphreys
UK) |
1999 |
2002 |
|
WG |
B5.17 |
Relay
software models for EMTP analysis |
Sidhu
(CA) |
2000 |
2003 |
|
WG |
B5.18 |
Guidelines
for the specification &evaluation of substation automation
systems |
De
Mesmaeker (CH) |
2001 |
2004 |
|
TF |
B5.01 |
Standard
communication test scenarios for integrated protection, control and data
communication |
Dr.
Brand (CH) |
1999 |
2002 |
|
TF |
B5.02 |
Design
for zero maintenance |
Koreman
(NL) |
1999 |
2002 |
|
TF |
B5.03 |
Engineering
tools for protective relaying |
M.
Kezunovic (FR) |
2000 |
|
|
TF |
B5.04 |
Sources
for education of protection engineers |
Prof.
Maun (BE) |
2000 |
2002 |
|
TF |
B5.05 |
Extracting,
developing and distributing information from data collected by
relays |
L. Messing
(SE) |
2002 |
2003 |
|
TF |
B5.06 |
Utilities´ approach
to protection and control refurbishment |
G.J.
Amantegui (ES) |
2001 |
2002 |
[1] Type : Working Group (WG),
Task Force (TF), Advisory Group (AG), Co-operation Group (CG), Joint Working
Group (JWG), Joint Task Force (JTF), …
[2] Number : identification
number
[3] Title : full title in
English
[4] Name : Initials NAME (2
letters for nationality)
[5] Created : year of
creation
[6] Disbanded : scheduled year of
disbanding